Case Study
Chlorinated Paraffins (CPW) Plants
Technofab Engineers offers advanced Chlorinated Paraffin Wax (CPW) Plants with complete process know-how, engineering, manufacturing, installation, and commissioning support.
20 TPD
Plant Capacity
30%
Energy Savings
120 Days
Project Timeline
100%
Client Satisfaction
Client Overview
The client required a reliable and energy-efficient plant for chlorinated paraffin wax production with strict safety standards and low maintenance.
Key Challenges :
- Precision Control: Batch-flow technology for exact chlorine percentages.
- Acid Recovery: Integrated systems to convert HCl gas into saleable grade acid.
- Material Integrity: Specialized corrosion-resistant reactors for long equipment life.
- Product Quality: Final stages designed for water-white, high-purity clarity.
- Proven Results: Successfully installed for:
- M/s Trust Chemical Industries, Egypt – 100 MT/day (Export)
- M/s Dhaka Salt & Chemical Ltd, Bangladesh – 40 MT/day
- In India:
- M/s Mardia Chemicals Ltd, Surendranagar – 100 MT/day
- Shree Rayalseema Alkalies & Allied Chemicals Ltd, Kurnool – 12 MT/day
- Applications
- PVC Wires & Cables
- PVC Flooring & Sheets
- Flexible PVC Compounds
- Footwear Industry
- Artificial Leather & Rexine
- Conveyor Belts & Rubber Products
- Adhesives & Sealants
- Key Advantages
- Excellent Flame Retardant Properties
- High Product Purity and Stability
- Improved PVC Flexibility
- Cost-Effective Secondary Plasticizer
- Consistent Chlorine Content
- High Production Efficiency
- Reliable and Safe Operation
Project Execution
01
Engineering
Process designing, simulation & detail engineering
02
Manufacturing
Precision manufacturing in our ISO-certified facility
03
Installation
On-site installation by expert team
04
Commissioning
Testing, commissioning & performance validation
Technical Specifications
Raw Material
Paraffin Oil, Chlorine Gas
Plant Capacity
20 TPD
Operating Temperature
120 – 150 °C
Operating Pressure
1.5 – 2.5 Kg/cm²
Material of Construction
SS 316 / MS / FRP
Automation
PLC Based Fully Automatic System
Project Impact
30%
Energy Savings
98%
Plant Uptime
25%
Increase In Productivity
Zero
Major Breakdowns
- Technofab Engineers delivered the plant on time with excellent quality. The performance has exceeded our expectations and their support is outstanding
Factory Manager
Leading Chemical Company, Bangladesh